English
Sicon Chat Union Electric Co.,Ltd
  • Key Projects - 43.6MVA UPS Installed at a Cloud Data Center in Beijing
    Key Projects - 43.6MVA UPS Installed at a Cloud Data Center in Beijing

    Sicon installed more than 100 Modular UPS units in the range of 400 to 600kVA to ensure reliable, efficient and safe operation of the Cloud Dater Center in Beijing. Location: Beijing, China Segment: Cloud Data Center; 45,000 racks Background: The complete Cloud Data Center is composed out of 18 building. The current build of phase one consist 2 of the 18 buildings. Cloud Data Center Overview Covers 83 acres, delivered construction area > 430,000 ㎡ Planned rack capacity: 45,000 unites, T4 T3 standard Available Racks in 2017 > 20,000 unites PUE Challenge: This is a Super Large Cloud Data Center, providing dedicated, mission-critical facilities. In order to confidently start this business, the owner needed a trusted partner, who have strong portfolio and capabilities to provide the right partnership for success. Sicon Technical Team brought the resources and talent to plan, design, build, commission and maintain this state of the art data center. The client experienced a successful partnership based on the utilization of Sicon’s Modular UPS and other Power facilities that have proven time over time to be the most reliable and efficient Power option possible. Solutions: ◆The Cloud Data Center is now Sicon’s single Largest Site with installed UPS capacity including Modular UPS totally 43.6MW. ◆Building #3, 2x 1500kVA UPS (3unites 500kVA UPS parallel), 15x 1600kVA UPS (4unites 400kVA parallel), 2x 500kVA UPS, 1 x 160kVA UPS. ◆Building #4, 2x 2400kVA UPS (4unites 600kVA UPS parallel), 6x 2000kVA UPS (4unites 500kVA parallel), 1x 1500kVA UPS (3unites 500kVA parallel), 1 x 300kVA modular UPS. ◆The systems were supplied against a demanding schedule, with systems being delivered and installed every two weeks for almost three months. ◆UPS Systems were provided in various configurations include 2(N+1), 2(N), and N+X are supported using AGM batteries. ◆Most of the UPS systems were installed in A+B dual cord configuration comprising the A & B supplies, supporting the dedicated IT & Server load. ◆A few UPS units were installed in standalone configuration with the 160kVA and 300kVA units supporting mechanical load Results: ◆Modular UPS A+B dual cord configuration (2N configuration) meets Tier IV classification for Data Center Power Designs ◆Total Cost of Ownership (TCO): CMS Modular UPS up to 96% efficiency, pay as grow, cost effective ◆Success operation in many sites of 10MW above Data Centers proved the Reliability of Sicon modular UPS; Winning the first phase 40MW of this Cloud Data Center, thanks for Client’s Trust on Sicon Team and Sicon Brand Value in UPS sector. Site Pictures: Photo Gallery of the Cloud Data Center Related Products 25-200kVA Rack independent Modular UPS 350-800KVA Modular UPS Related Products Industrial Modular UPS N+X Solution 2N Power Solution Sicon Enterprise Video & Sicon Online Show Room Contact Sicon Team Tel: 86-311-85903762 Fax: 86-311-85903718 Email: enquiry@scupower.com Address: Bldg.14&15, No.319, Xiangjiang Street,Hi-Tech Zone, Shijiazhuang,Hebei, China (050035)

    more >>
  • Astronomy Case-Sicon Modular UPS Applied to the World’s Largest Single-aperture Telescope Base
    Astronomy Case-Sicon Modular UPS Applied to the World’s Largest Single-aperture Telescope Base

    The Chinese Academy of Sciences(CAS) announced that its new 500-meter Aperture Spherical Telescope (FAST),China TOP Nine Science &Technology Infrastructure, was ready to use in September, 2016. With an area equal to 30 soccer fields, this behemoth is now the largest filled-in, single-dish radio telescope in the world. As the world's largest single-aperture telescope, its scientific impact on astronomy is extraordinary, and it is certainly revolutionizing the natural sciences. Location Karst, Pingtang, Guizhou Province, Southwestern China. Challenge To ensure reliable uninterrupted power supply to the super large Telescope, Fast has extremely high demand on the stability and reliability of UPS power supply equipment, whose performance directly affecting the accuracy and stability of astronomical observations. Solution As one of the cooperative partner, Sicon provided complete power supply guarantee with its CMS series 3 phase UPS and Modular N+X solution , which features with high reliability and high cost-efficiency. Only available to get 1 fixed redundancy on standalone UPS 1+1 solution, in modular ups each power module could be the X as redundancy which gets higher reliability. CMS Modular UPS: 60KVA system , 10KVA power module, N+X redundancy system, THDI Result The fact Zero fault power protection, proved the high reliability and stability of Scion modular UPS, which also received highly praise from the Chinese Academy of Sciences. We will spare every effort to provide excellent power supply solutions for national astronomical research. Related products ◆CMS Modular UPS 10-100 KVA (Hot-swappable, Field-replaceable STS, N+X redundancy) Related solutions ◆Industrial Modular UPS N+X Solution Contact Sicon Team Tel: 86-311-85903762 Fax: 86-311-85903718 Email: enquiry@scupower.com Address: Bldg.14&15, No.319, Xiangjiang Street,Hi-Tech Zone, Shijiazhuang,Hebei, China (050035)

    more >>
  • Sicon UPS at International Fair
    Sicon UPS at International Fair

    Being one of the leading uninterruptible power supply(UPS) suppliers in China, Sicon has been participating in plenty of various international events, such as Olympic Games, the Asian Games, 2014 APEC, World Expo, G20 Summit, EU-China summit etc..which require uninterruptible, reliable and stable power supply guarantee. Over these international fairs, Sicon not only has provided safe and reliable power to ensure the normal operation of venue facilities, but also has sent professional technicians to provide on-site technical support. All these prove Sicon’s excellent product performance and customer service concept. 2008 Beijing Olympic Games Sicon Modular UPS with high reliability, energy saving and environmental protection won the bid of 2008 Beijing Olympic Games, ensuring uninterrupted power supply protection for the communication and lightning project of Olympic venues. Install Site: Water cube,Hockey rink, shooting gallery. Solution: Online UPS CMS-150KVA Modular N+X solution Benefit: ◆Hot swap modules, N+X redundancy design. ◆Online add/remove module, online maintenance, MTTR=5 mines, high reliability. ◆Total Cost of Ownership(TCO) up to 96% efficiency, pay as grow, high cost-efficiency. ◆Small footprint, space-saving high density design. Result: With “zero incidents, zero accidents, zero complaints”, Sicon Team cross the country a satisfactory answer, and won Olympic recognition. 2014 APEC Conference APEC Conference was one of the largest and top level major international multilateral activities held in China. Sicon provided complete power supply guarantee for this significant international affaire. Install site Lightning, audio &video system,control center, conference center. Other important places like:dinner room, washing room, hotels. Solution CMS-200KVA modular UPS DSP11 standalone UPS Benefit ◆High efficiency with THDI ≤ 3%, and input PF ≥ 0.99. ◆Truly online double conversion ups. ◆Flexible modular design, high reliability. ◆Online expansion, updates and maintenance. Results: Sicon UPS with high reliability, easy expansion, high efficiency and low THDI, ensures safe and reliable power supply during the conference. Low-carbon, environmental friendly is fit for the “green” concept advocated by the APEC conference. Related products ◆150KVA Online UPS ◆200KVA modular UPS ◆standalone UPS Related solutions ◆ Why modular UPS Contact Sicon Team Tel: 86-311-85903762 Fax: 86-311-85903718 Email: enquiry@scupower.com Address: Bldg.14&15, No.319, Xiangjiang Street,Hi-Tech Zone, Shijiazhuang,Hebei, China (050035)

    more >>

Copyright © 2015-2017 Sicon Chat Union Electric Co.,Ltd.