English
Sicon Chat Union Electric Co.,Ltd
  • SCU Electric Solutions
    Sicon has a lifetime experience in research, development and production of electrical and power electronic solutions for the global industry. Sicon products take the lead in every field when it relates to environmental or efficiency performance.

Why modular UPS

Challenge The role of a uninterruptible power system (UPS) is to provide clear and safe power to the mission critical load, and allow continued operation of the load during mains power failures. Compared with traditional standalone UPS, A modular UPS is constructed from components that allow for quick and simple increase in the system’s output, including hot swap UPS modules, monitoring module, static bypass module and system rack. Standardized, scalable, redundant, modular design architecture of modular UPS result improved efficiency, lower cost of ownership and better customer service through high availability. Sicon Modular UPS benefit Availability: hot swap modules, standardization, modular, N+X redundancy Scalability: Scalable power modules, online expansion, power scale and runtime scale Manageability: online add or remove module, online maintenance, MTTR=5 mines, tool less module replacement Total Cost of Ownership (TCO):Up to 96% efficiency, pay as grow, cost effective Products we offer >> 10-100KVA Modular UPS(For Network Computer Room) >> 150-250KVA Modular UPS( For Medium Power) >> 350-800KVA Modular UPS(For Data Center) >> 6-36KVA Modular UPS(Small Power, Rack Type) >> 25-200kVA UPS(Rack Independent, SKD Choice) Reference High-Speed Railway Project Sicon provide many modular UPS with high efficiency and energy saving for Wuhan- Guangzhou high- speed railway, Wuhan railway station projects, successfully solve the problem of poor and unstable environment, sparsely populated, difficult operation and maintenance management along the railways. More References Sicon Enterprise Video & Sicon Online Show Room Contact Sicon Team Tel: 86-311-85903762 Fax: 86-311-85903718 Email: Enquiry@Scupower.Com Address: Bldg.14&15, No.319, Xiangjiang Street,Hi-Tech Zone, Shijiazhuang,Hebei, China (050035)
>> More
Why modular UPS

Data Center △2N Power Solution

Challenge Data centers are facing challenges of growing demands for higher revenues, and improved customer experience and greater operational efficiency. In order to meet these demands, data center professionals face unprecedented complexity. Sicon Solution There are many critical computers and other load equipment in modern data center, which has very strict requirement on power supply system. Easy maintenance, easy expansion, fault tolerance, cost-effective, and energy saving are all data center user’s concern.2N power solution and △2N power solution both apply to the data center equipment. Now we introduce △2N power solution in details △2N power solution Benefit 1) Normal condition, double bus solution for each group of load. Each UPS could bear load of 66% of rated power max. 2) If one UPS fails, the remaining two UPSs share the three group of load. Products We Offer >> 50KVA--100KVA   UPS System(Based On 10KVA Ups Module) >> 150KVA--250KVA  UPS System(Based On 25KVA Ups Module) >> 350KVA--800KVA  UPS System(Based On 50KVA Ups Module) Reference Join hand with APEC APEC Conference was one of the largest and top level major international multilateral activity held in China. Sicon provided perfect tailored integrated overall power supply solution. Sicon UPS with high reliability, easy expansion, high efficiency and low THDI, ensures safe and reliable power supply during the conference. Low carbon, environmental friendly is fit for the "green" concept advocated by the APEC conference. Contact SCU Team Tel: 86-311-85903762 Fax: 86-311-85903718 Email: Enquiry@Scupower.Com Address: Bldg.14&15, No.319, Xiangjiang Street,Hi-Tech Zone, Shijiazhuang,Hebei, China (050035)
>> More
Data Center △2N Power Solution

2N Power Solution

Challenge TIER 3 Data Center are a highly efficient data centre that would be simple to upgrade and able to facilitate mixed densities to accommodate different customer requirements. The facility needed to be scalable for future growth without disruption to existing clients, as well as robust and resilient to protect customers’ data and ensure business continuity. Cost efficiency was also important and, as part of this, the whitespace had to be maximised and the existing power infrastructure incorporated in the design. Solution In the cases of TIER3 and TIER4 Data Center’s demand , 2N power mode is the safest with the best security solution. 2N power solution, provide two independent power sources to protect the electrical systems against unexpected power failure. The loads are powered by both power sources, or the two sources feed power independently to their own loads. At a data center, a 2N system contains double the amount of equipment needed that run separately with no single points of failure. These 2N systems are far more reliable than an N+1 system because they offer a fully redundant system that can be easily maintained on a regular basis without losing any power to subsequent systems.  In the event of an extended power outage, a 2N system will still keep things up and running. Also,Sicon modular UPS 2N system can solve the circulation between each other UPS modules, synchronization and control of single point of bottlenecks or failure; its zero risk online maintenance and upgrade expansion, satisfy the need of the late development of the user; Modest investment in equipment, does not need one-time investment in place. Also the later maintenance and operation cost of equipment are low, to fully meet the higher demand of TⅣlevel users. This modular UPS 2N system application has become the most choice. Modular UPS Benefit Availability: hot swap modules, standardization, modular, N+X redundancy Scalability: Scalable power modules, online expansion, power scale and runtime scale Manageability: online add or remove module, online maintenance, MTTR=5 mines, tool less module replacement Total Cost of Ownership (TCO):Up to 96% efficiency, pay as grow, cost effective Products We Offer >> 50KVA--100KVA   UPS System(Based On 10KVA Ups Module) >> 150KVA--250KVA  UPS System(Based On 25KVA Ups Module) >> 350KVA--800KVA  UPS System(Based On 50KVA Ups Module) Reference Telecom Data Center--3.2MW Background China Unicom is officially established on 6 January 2009 on the basis of the merger of former China Netcom and former China Unicom. It has subsidiaries in 31 provinces (autonomous regions and municipalities) across China and many countries and regions around the world. China Unicom has undergone considerable growth in recent years and is working with an increasing number of customers join them. As a result of this rapid expansion the company needed to develop a resilient and highly energy efficient data center tha...
>> More
2N Power Solution

Industrial Modular UPS N+X Solution

Challenge Industrial UPS power supply environment is relatively poor, such as: poor ventilation, humidity, dust and many other adverse conditions on the UPS.In such a harsh environment for the UPS, it should have very strong adaptability , and industrial users require high reliability of power supply system, low investment costs, operating under such harsh conditions but also to ensure reliability and investment costs. Sicon Solution In the world of data centers, an N+1 system, also called parallel redundancy, and is a safeguard to ensure that an uninterruptible power supply (UPS) system is always available. Compare with standalone UPS 1+1 solution, modular UPS N+X solution features with high reliability and high cost-efficiency. Only available to get 1 fixed redundancy on standalone UPS 1+1 solution, in modular ups each power module could be the X as redundancy which gets higher reliability In the construction of information network power supplying system of industrial users, they always wrongly estimate the capacity of high-end UPS to lead the too high purchasing costs for the result that cannot be satisfied with the loads' requirements or cause the resources, spaces and energy waste situations etc. modular (N+X) can effectively resolve this problem through the extensible module structure, it can help the users to make the next-step UPS construction and investment in the future. When the requirement of using power loads of users is increasing we just need to add the power module piece by the using power planning stage, meanwhile, through the modular integration the expansible requirement of system is able to be satisfied fully and also has the flexible mobility and better reliability which will be the milestone in the power supply protection fields. Modular UPS Benefit Availability: hot swap modules, standardization, modular, N+X redundancy Scalability: Scalable power modules, online expansion, power scale and runtime scale Manageability: online add or remove module, online maintenance, MTTR=5 mines, tool less module replacement Total Cost of Ownership (TCO):Up to 96% efficiency, pay as grow, cost effective Products we offer >> 50KVA--100KVA   UPS System(Based On 10KVA Ups Module) >> 150KVA--250KVA  UPS System(Based On 25KVA Ups Module) >> 350KVA--800KVA  UPS System(Based On 50KVA Ups Module) Reference Airport project In transportation field, Sicon UPS are widely used in airport, highway projects, including Beijingairport, Shanghai airport, Chongqing airport, Xinjiang, Shanxi, Sichuan highway projects, With excellent product performance, good after-sales service has won the praise of customers. Contact SCU Team Tel: 86-311-85903762 Fax: 86-311-85903718 Email: Enquiry@Scupower.Com Address: Bldg.14&15, No.319, Xiangjiang Street,Hi-Tech Zone, Shijiazhuang,Hebei, China (050035)
>> More
Industrial  Modular UPS N+X  Solution

Micro Data Center Solution

Challenge I.Find demands from market As the coming of big data times, its influence has spread to various industries, such as small enterprises, base stations, bank outlets, railway stations etc.. Management software and modern paperless office have greatly improved working efficiency, but meanwhile have brought amounts of data storage and exchanges. If the server suffers power outage during data storage or exchanges, these data will be lost and cause enterprise damages. Under this circumstance, the construction of server room is extremely urgent. II.Find solutions from question Problem-1 Deployment: For the changing demands, IT infrastructure department is required to provide rapid and flexible supports. Therefore, IT room deployment needs to guarantee speed and quality, meanwhile needs to consider future expansion during deployment. While, because of the small-scale rooms which were mostly rebuilt from working offices, it is difficult to create the required operating conditions for IT equipment. The numerous defects in design and implementation bring large potential hazards for the availability and safety of the IT room. Problem-2 Reliability: Server outages will bring the most direct impact for business benefits. Therefore, the power distribution environment, safety facilities and power supply equipment should have extremely high reliability and quality to cope with damages and ensure data safety. However, non-standard IT room construction may probably lead to accumulated equipment and disordered circuits. Due to the different equipment suppliers, its maintenance is doubly difficult. Problem-3 Cost: In face of competition, enterprises should not only guarantee data safety, but also control budget cost in IT room construction, operation and maintenance etc.. Equipment investment must be all-round; cost must be low; operation must be reliable and energy-efficient; system maintenance must be simple and intelligent. Sicon Solution Definition of Micro Data Center A rack cabinet as basic unit, integrating cooling, power supply and distribution module, network, cabling, monitoring etc.. All the components can be prefabricated in manufacturer. Flexible disassembly, quick assembly. Function as a complete data center, same size with a standard cabinet. So call it as Micro Data Center, or MDC for short. MDC can take place of small data center or server room, with 3kw or 12kw power IT equipment inside. MDC can satisfy high-degree protection demands, such as IP 56, burglarproof degree 2-4. 33 U Server Space Solution 7KW cooling 12KVA power capacity 40Ah lithium battery pack, 1 hour discharging guaranteed Dimension:800*1100*2000 IP56, burglarproof degree 2-6 (one-stop shopping, one-cabinet delivery) 33U+42U Server Space Solution 14KW cooling 24KVA power capacity 80Ah lithium battery pack, 1 hour discharging guaranteed Dimension:1600*1100*2000 IP56, burglarproof degree 2-6 (expansion and integration solution) 33U+42U+XU Server Space Solution 14KW cooling 24K...
>> More
Micro Data Center Solution

EV Charging Solution

Challenge Due to inconsistant construction standards, high construction costs, long cycle, low utilization rate of charging facilities,conventional charging station operation and maintenance cost is high, often resulting in investment income imbalance。 Sicon Solution New Energy Charging Station Integration of new energy charging station is a breakthrough in creative response to this situation. Adopting modular, standardized design concept, according to user requirements to achieve dynamic growth, which can realize the priority use of new energy, at the same time can also be in through diversified income channels in the absence of any car. It consists of photovoltaic, storage batteries, power router (bus, two-way converter, low-voltage power distribution units) and charging facilities, with good flexibility, high integration, enabling fast and flexible deployment, and is a standard, integrated charging station. System advantages: standardized, modularization, integrated, green energy saving, revenue diversification System Feature 1.Green renewable energy 2.Modularized, standardized structure of energy storage lithium battery cabinet and bidirectional energy storage device. 3.To realize the grid load shifting and Priority to the use of new energy sources, rational allocation of resources, optimize the return on investment ratio through the energy storage device. 4. one pile multi terminal structure 5.Small volume 6.High efficiency 7.Safety measures are equipped within the station 8.Intelligent interactive cloud platform 9.Standardized, scale Products We Offer >> New Energy Charging Station >> DC Fast Charging Station >> AC Charging Station >> AC-DC Charging Module >> On-Board Car Charger Reference China POVETIO Project Sicon, as the core supplier of China POVETIO, provides many series of charging facilities every year. With advanced R& D technology and Technical reserves, Sicon launched many new charging facilities with high performance, meeting the demand of POVETIO and built a close cooperation relationship with POVETIO. Contact SCU Team Tel: 86-311-85903762 Fax: 86-311-85903718 Email: Enquiry@Scupower.Com Address: Bldg.14&15, No.319, Xiangjiang Street,Hi-Tech Zone, Shijiazhuang,Hebei, China (050035)
>> More
EV Charging Solution

ESS & Battery Solution

Challenge Sicon with his lifetime experience in power electronics has made a high efficient B-directional converter technology available that in combination with Sicon Lithium battery solutions introduces a range of energy storage possibilities from homeowners to industry applications. Sicon Solution B-direction converter B-direction converters are dedicated to charging/discharging the storage battery and providing intermediate link between the grid and the storage battery in different occasions, including grid-connected system, off grid system and hybrid system. Application: Peak Shifting, Micro Grid, renewable energy, industrial use Lithium battery Design idea: standard 18650 lithium ion battery, standard battery module, and then modular battery cabinet. Compared with lead acid battery, lithium battery features with small volume, high power density, long life span, igh discharge rate, high temperature. Application: with b-direction converter in energy storage and with UPS in datacenter. BMS (battery management system) Measurement, measures general information of battery such as voltage, current, and temperature, etc Diagnosis, diagnoses the safety of battery and detects errors Control, controlsthe battery temperatures and cell balancing Communication, provides battery data by communicating with PCBs and operating system Products We Offer >> Lead Carbon Battery >> Lithium Battery >> Battery Management System >> B-direction Converter Contact SCU Team Tel: 86-311-85903762 Fax: 86-311-85903718 Email: Enquiry@Scupower.Com Address: Bldg.14&15, No.319, Xiangjiang Street,Hi-Tech Zone, Shijiazhuang,Hebei, China (050035)
>> More
ESS & Battery Solution

Copyright © 2015-2024 Sicon Chat Union Electric Co.,Ltd.