English
Sicon Chat Union Electric Co.,Ltd

Blog


  • DC Fast Charging Systems Standards – CHAdeMO, CCS, Supercharger, China
    • 2020-09-22 16:38:02
    • admin

    There are four or so DC Fast Charging systems currently being used by EV charging  manufacturers. The article shown here has four different EV connectors . At the current moment the leading car for each type is: ●CHAdeMO – Nissan Leaf ● CCS – BMW i3 ● Supercharger – Tesla Model S ● China GB/T Let’s take a look at each. CHAdeMO – (Nissan, Mitsubishi, Kia) CHAdeMO is the trade name of a quick c...

  • Online UPS overview
    • 2019-05-27 14:04:43
    • admin

    Online UPSs are the optimal solution for customers’ telecommunications systems, call centers, medium to large networks and servers. Sicon online UPS/modular UPS/three phase UPS, full range from 6KVA to 3200 KVA , increases your customers’ systems reliability and provides the highest level of power protection. What is an online UPS? Online UPS is slightly different than offline UPS. Instead of the ...

  • EV Charger Connector Description SAE J1172
    • 2019-06-18 17:49:45
    • admin

    There are five or so EV Charger Connector Description SAE J1172 EV Charging systems currently being used by electric car manufacturers. The picture shown here has four different connectors Designed for single phase electrical systems with 120V or 240V Connector Diameter – 43 mm (1.7in) 5 pins (AC Line 1,...

  • Tips for uninterruptible power system(UPS) maintenance
    • 2019-06-18 17:44:52
    • admin

    All standalone/online UPS system need to get regular maintenance, you may not be able to do much about huge attacks and failures, but you can take steps to ensure that many potential downtime events are thwarted through UPS maintenance. 1.Regular UPS maintenance For the uninterruptible power supply(UPS), you should check whether the meters and instrumentation is in correct operation,also monitor p...

  • What to do when you (UPS)uninterruptible power system is reaching end-of- life soon?
    • 2019-06-18 17:41:26
    • admin

    Have you experienced your (UPS)uninterruptible power supply appear to be running time? The replacement of UPS battery, capacitors and fans are all part of your single phase UPS /three phase UPS system lifecycle. Following are some tips for you. 1.Review the purpose of your UPS system and your current infrastructure If your UPS system has reached her end of life, it’s a good chance for you to revie...

  • Basic components of Uninterruptible Power System and their functions
    • 2019-06-18 16:44:49
    • admin

    As we all know, Uninterruptible power system (UPS)is to protect your critical equipment. Actually, we suggest you learn the key components of a UPS further,so you can better understand your UPS system and ensure your mission critical load remains online. In this article, we show you four key components of online UPS and their functions to help you know more. The battery: The battery is the he...

  • What will your do when plan for EV charging infrastructure?
    • 2019-06-18 16:46:17
    • admin

    Nowadays, the demand for EV charging infrastructure and DC fast charger is growing aggressively. When you intend to plan out EV charging infrastructure, there are a number of factors need to be considered. In this article we show you three key considerations when leading a successful EV charging infrastructure project. 1.When will you invest EV charging station ? First, figure out whether plug-ins...

  • Tips to Save Energy in Your Data Center(2)
    • 2019-06-18 16:23:29
    • admin

    In the last article we discussed two ways to save energy in the data center, If the idea of dramatically reducing energy costs in your data center intrigues you, read on to discover how to gain this edge for your organization. ●Adopt power distribution at 208V/230V. To satisfy global markets, virtually all IT equipment is rated to work with input power voltages ranging from 100V to 240V AC. The hi...

  • Tips to Save Energy in the Data Center (1)
    • 2019-06-18 16:19:31
    • admin

    If you manage a data center , or engineer the architecture for clients who do, you know how critical to save energy have become. High-density computing environments can be a huge drain on operating budgets for several reasons:1) expanding power demands, 2) increasing power costs, and 3) excessive heat. It's a challenge to conserve energy while supporting these growing loads - without bringing unwa...

  • Reduce the loss of power risks,right now!
    • 2019-06-18 15:57:06
    • admin

    If you have witnessed in the past flickering lights in your home or office, computer freezing up or restarting, then you may be suffering a power supply problem. The IT equipment storing data is extremely sensitive and will not tolerate loss of power for more than a few milliseconds. It is also at risk from power anomalies such as over-voltages, transients, sags and spikes arising from the power&n...

Copyright © 2015-2024 Sicon Chat Union Electric Co.,Ltd.